LegalPresence

Litigation command · counsel-approval workbench

AI that is not allowed to file. Counsel is.

LegalPresence keeps the procedural clock honest and the filing gate closed until the record, the cites, and the right humans say go — then hands counsel a clean package.

“The machine reasons. Counsel decides. Nothing reaches a filing unverified.”

Four partner jobs

What litigators actually buy

Not “more AI.” Lower risk of a bad filing, and control over what leaves the firm. Everything we ship maps to four jobs.

1 · Clock

What is due — and who owns it

Deadlines, owners, alerts, dependency path. HARD_BLOCKS propagates risk so a slip on the PE affidavit shows up on the hearing.

2 · File

Find the exhibit / dep page now

Matter evidence, OCR locks, assertion coverage. Pins from draft sentences to page and ¶ — not another Drive folder.

3 · Draft

Faster work product

War-room drafting against a locked fact sheet. CRM is source of truth; Word gets a clean export when gates clear.

4 · Gate

Accuracy, approvals, package

Citation checks, role SIGNOFF, filing-clean strip, court pack seal. Fail loud — never silent “looks fine.”

Capability scorecard

Where we are strong — and what we bridge next

Honest map for partners comparing Filevine (ops), CoCounsel/Harvey (draft AI), and Clearbrief (Word finish).

Partner needLegalPresence todayStatusNext
“What is due and who owns it?”Next 3 + Assign owner + dependency DAGStrongUNOWNED critical flagged
“Don’t miss the hearing / filing”Path strip + HARD_BLOCKS + path-ICSStrongCalendar export live
“Find the exhibit / dep page”Matter search + fact pins + evidence railStrongHeatmap for coverage
“Draft faster”Workbench + module gen + Word loopPartialModule gen depth
“Don’t invent law / misstate record”R6 cites + good-law stamp + pinsStrongCitator always counsel-final
“I work in Word”Filing-clean DOCX + Word bridgeStrongOffice.js add-in later
“E-file this package”Package recipe + hard-block seal ZIPStrongCounsel still e-files
“Who approved this?”SIGNOFF + approval ledger stampStrongRole-gated clear
“Is the theory ready?”Theories · gaps · viability on homeStrongPartner spine first
“Client texts & docs in case”Pull mailbox UI · CRM evidencePartialSecureVault IMAP config
“Secure and privileged”Counsel-gated studio · fail-loudPartialClean-export default
“Don’t drown me in UI”Next 3 · Matter gate · Advanced collapsedStrongPartner IA shipped

We own Clock + Gate. We bridge File + Draft into Word. We do not pretend to replace Westlaw or Filevine billing.

Product flow

Matter command loop

One spine instead of fifteen peer widgets. Advanced tools stay available — they are not the front door.

Next 3 · owners→ Gate status→ Clock / path→ Theory · gaps→ Draft / DOCX→ Package seal
Matter home

Partner in under a minute

  • What is due and who owns it
  • FILE / NO-FILE with reasons
  • Critical path without opening Advanced
  • Top theories and blocking gaps
Workbench

Paper command

  • Work product | Filing preview
  • Citations · Gate · Package recipe
  • DOCX export/import · Word bridge
  • CRM save + versions (email is delivery only)

In the product

What counsel actually opens

Live screens from the matter command workbench — not mockups. Advanced tools stay behind the partner spine.

Litigation Command: critical path, Next 3 actions, recent NYSCEF filings on a live matter
Command — Next 3, Matter gate, critical path, and docket pulse. One home for the partner minute.
Workbench toolbar with Proofread, Citations, Gate, Package recipe, Word bridge, and filing tools
Workbench — Paper command: Gate, Citations, Package recipe, Word bridge. CRM is source of truth.
Discover precedent research: ranked cases with relevance scores and plaintiff serial-litigant profiles
Discover (in-studio) — Precedent research and party patterns for a live matter. Unverified until counsel citates. Not the public Title WorkBench interview.

Studio access is gated. Screenshots are from a real commercial/RE matter workspace. Web-sourced Discover hits always carry a verify-before-file banner.

Tightly controlled AI

What is not allowed to happen

Grounded

Drafts sit on CRM fact sheets and evidence — not free-floating chat.

Gated

Unverified cites and open role SIGNOFFs block counsel-approval paths.

Fail loud

If a check does not run, the document says so. No silent “looks fine.”

Early access

Pilot one matter.

Scoped pilot on a real litigation file. Or answer the public partner interview on Title WorkBench — we use it to prioritize Clock, Gate, Word, and search. (In-product Discover is separate: precedent research for counsel after access.)

Work email · No marketing lists · Human reply · Or take the Title WorkBench interview →

Enlarged screenshot